$0 New South Wales Minimum Standards Checklist

Mandatory Pre-Tenancy Documents for NSW Landlords: A Complete Checklist

The Three Core Handover Documents

NSW law requires these three core documents before or at the time the residential tenancy agreement is signed. Other handover items may also apply, including the landlord's contact details, an invitation to lodge the bond through Rental Bonds Online, and strata by-laws where relevant.

1. Tenant Information Statement — published by NSW Fair Trading, this booklet explains tenant rights and obligations. Provide it before or at signing. Download the current version from the Fair Trading website each time — using an outdated copy does not satisfy the requirement.

2. Standard Form Residential Tenancy Agreement — prescribed under Schedule 1 of the Regulation. Use the official form; mandatory standard terms cannot be deleted or altered. Additional terms can be included if they do not conflict with the Act.

3. Condition Report — prescribed under Schedule 2 of the Regulation. Give the tenant two copies (or one electronic copy) of the completed and signed report before or when you give the agreement for signing. The tenant has 7 days from taking possession to inspect, complete their section, and return one copy.

Material Fact Disclosures

Section 26 of the Act and Clause 7 of the Regulation require you to disclose specific material facts to the prospective tenant before entering into the agreement. Failure to disclose is an offence and gives the tenant the right to terminate the agreement or seek NCAT compensation.

You must disclose if the property:

  • Is listed on the Loose-Fill Asbestos Insulation (LFAI) Register maintained by Fair Trading
  • Has been the scene of a serious violent crime within the preceding 5 years
  • Has been affected by flooding or bushfire within the preceding 5 years
  • Is subject to health or safety hazards not obvious on visual inspection
  • Is part of a strata scheme where major structural repairs or building work will affect the lot during the tenancy
  • Shares a utility supply meter or embedded network arrangement

These disclosures are not optional context — they are statutory obligations with penalty consequences.

Swimming Pool Certificate

If the property has a swimming pool or spa capable of being filled to a depth greater than 30 centimetres, provide the tenant with a valid Certificate of Compliance or a relevant Occupation Certificate issued within the last 3 years when the agreement is signed. A Certificate of Non-Compliance is not acceptable for a rental property.

The strata exemption applies: this requirement does not apply to lots in strata or community schemes containing more than two lots.

Free Download

Get the New South Wales Minimum Standards Checklist

Everything in this article as a printable checklist — plus action plans and reference guides you can start using today.

Timing Is Everything

The handover sequence matters:

  1. Before signing: deliver the Tenant Information Statement, disclose all material facts, provide the landlord's direct contact details and an invitation to lodge the bond through Rental Bonds Online, and provide strata by-laws if applicable
  2. Before or when giving the agreement for signing: give the tenant two copies (or one electronic copy) of the completed Condition Report
  3. At signing: execute the Standard Form Residential Tenancy Agreement and provide a valid pool Certificate of Compliance or relevant Occupation Certificate (if applicable)
  4. Within 7 days of possession: tenant inspects, completes their section of the Condition Report, and returns one copy

If you manage the property through an agent, these obligations still rest with you as the landlord. The agent performs the tasks on your behalf, but if they skip a step, you bear the liability.

What Most Self-Managing Landlords Miss

The most common gap is the material fact disclosures. Self-managing landlords often know about the lease and the condition report but have never heard of the Section 26 disclosure obligations. A property affected by flooding within the preceding 5 years, a strata lot where major building work is scheduled to affect the lot during the tenancy, or a property listed on the Loose-Fill Asbestos Insulation Register can trigger mandatory disclosure.

The second gap is the condition report form itself. You must use the prescribed Schedule 2 form — not a generic property inspection template from the internet. The prescribed form includes tick-boxes for Section 52 minimum standards compliance, smoke alarms, and water efficiency that generic templates omit.

For a printable pre-tenancy document handover checklist that tracks every form, certificate, and disclosure across the full signing sequence, the Rental Minimum Standards in New South Wales guide covers the complete workflow.

Get Your Free New South Wales Minimum Standards Checklist

Download the New South Wales Minimum Standards Checklist — a printable guide with checklists, scripts, and action plans you can start using today.

Learn More →