$0 New Brunswick Rent Increase Checklist

Above-Cap Rent Increase in New Brunswick: How to Apply for Above 3% up to 9%

When You Can Exceed the 3% Cap

The 3% annual rent cap isn't absolute. Under Section 11.13 of the Residential Tenancies Act and Regulation 82-218 Section 11.12, landlords who have incurred capital expenditures for renovations can apply to raise rent above 3%, up to a statutory maximum of 9%.

The critical word is "capital." The expenditure must be for work that prolongs the physical life of the building — structural repairs, major system replacements, or significant renovations. The application goes to the Tenant and Landlord Relations Office and must be approved by a Residential Tenancies Officer before the notice is served.

The Application Process

The above-cap route follows a strict sequence. Skipping a step — especially step 4 — invalidates the entire increase.

Step 1: Incur the expenditure. Before applying, the landlord must have incurred capital expenditures for renovations. The regulation requires proof of incurred costs; it does not specify that all work must be finished.

Step 2: Assemble your evidence. The officer will need documentation proving what was done and what it cost. Gather contractor invoices, receipts, and descriptions of the completed work.

Step 3: Submit the required application. Regulation 82-218, section 11.12(2), requires the form provided by a Residential Tenancies Officer and information proving the incurred capital expenditures. Submit it to the Tenant and Landlord Relations Office. There is no fee for this application.

Step 4: Wait for the decision. The officer reviews your evidence and makes a determination. Three outcomes are possible:

  • Full approval at the requested percentage
  • Partial approval at a lower percentage
  • Rejection (the work doesn't qualify)

Step 5: Serve the notice. Only after receiving written approval can you serve the rent increase notice on the tenant, with the approved percentage. The standard six-month notice period and separate document rule still apply.

What Qualifies

The regulation specifies capital expenditures incurred for renovations — work that extends the useful life of the premises. Examples that typically qualify:

  • Roof replacement
  • Foundation repairs
  • Complete HVAC system replacement
  • Major plumbing or electrical overhauls
  • Structural modifications

What doesn't meet the threshold: repainting walls, replacing carpet, minor appliance upgrades, landscaping, or rising operational costs like property taxes and utility rates. These are ordinary maintenance or operating expenses, not capital improvements.

Free Download

Get the New Brunswick Rent Increase Checklist

Everything in this article as a printable checklist — plus action plans and reference guides you can start using today.

The 9% Maximum

Even with officer approval, the increase cannot exceed 9% in total. This is the statutory ceiling — an officer has no authority to approve anything higher, regardless of how much the renovations cost.

If you spent enough on renovations to justify a 12% increase, you get 9% at most. The unrecovered balance can't be carried forward to a future year's application.

What Happens Without Approval

If you serve a notice proposing, say, 7% without first obtaining officer approval, the "deemed 3%" mechanism kicks in under Section 11.12. The notice isn't voided — it's automatically scaled back to 3%. The tenant pays only the capped amount.

This means the above-cap application must happen before the notice, not after. You can't serve a 7% notice and then retroactively justify it by filing an application.

Timing and Interaction with Other Rules

The above-cap application process sits on top of all the standard rules:

  • Default frequency limit still applies to tenancies governed by Section 11.1 — unless the landlord and tenant agree otherwise in writing, no increase in the first consecutive 12-month period and no more than one in any other consecutive 12-month period
  • 6-month notice period still applies — counted from service of the notice after approval
  • Separate document rule still applies — the notice must be standalone

The application process itself isn't time-limited by the Act, but the practical constraint is clear: renovation, application, officer review, then six months' notice. Plan for the full timeline.

For the complete rent increase workflow — including standard increases, notice content, service methods, and tenant review procedures — see our Rent Increases in New Brunswick guide.

Get Your Free New Brunswick Rent Increase Checklist

Download the New Brunswick Rent Increase Checklist — a printable guide with checklists, scripts, and action plans you can start using today.

Learn More →