Ground 6 is the possession ground for landlords who need to demolish, reconstruct, or carry out substantial works on a property — and the works can't reasonably be done with the tenant in occupation. It's a mandatory ground: if the statutory facts are proved, the court must make the order.

Most self-managing landlords won't use Ground 6 directly. It's more common among developers, housing associations converting stock, and landlords with serious structural defects. But for the landlords who do need it, the requirements are specific and the mistakes expensive.

What Ground 6 Covers

The landlord must intend to demolish, reconstruct, or carry out "substantial works" on the property or a significant part of it. The threshold is high — decorating, replacing a kitchen, or fixing a roof doesn't qualify. The works must be so extensive that they cannot reasonably be carried out while the tenant remains in occupation.

Typical scenarios:

  • Converting a house into flats (or flats back into a house)
  • Demolishing a structurally defective building and rebuilding
  • Major structural alteration requiring the property to be empty for months
  • Removing asbestos or other hazardous materials requiring full evacuation

If the works could be done with the tenant living there — even if it would be inconvenient — the court may refuse the order. The test is whether the works require vacant possession, not whether vacant possession would make them easier.

Notice Period and Protected Period

Ground 6 requires 4 months' notice. Like Grounds 1 and 1A, this is one of the longer notice periods in Schedule 2.

There's also a 6-month protected period at the start of the tenancy. Ground 6 cannot be used during the first 6 months — shorter than the 12-month protection for Grounds 1 and 1A, reflecting that structural works may be genuinely urgent.

Ground 6B: Statutory Enforcement

Ground 6B is a related mandatory ground where a local housing authority has served an enforcement notice requiring the landlord to carry out specific works, and those works can't be done with the tenant present. Ground 6B also requires 4 months' notice. If the court makes a possession order on Ground 6B, it may order compensation for damage or loss the tenant sustained as a result of the order, taking account of the circumstances that made Ground 6B available, including tenant conduct.

The difference: Ground 6 is the landlord's choice to redevelop. Ground 6B is a response to a council enforcement order. Both lead to vacant possession, and Ground 6B carries a separate statutory power for the court to order compensation.

Free Download

Get the England Section 8 Notice Checklist

Everything in this article as a printable checklist — plus action plans and reference guides you can start using today.

Evidence Requirements

The court will scrutinise whether the claimed works genuinely require vacant possession. You'll need:

  • Detailed plans or specifications — architect's drawings, structural engineer's report, or a builder's scope of work showing the extent of the reconstruction
  • Evidence the works can't be done with the tenant in occupation — a professional opinion (from the architect, engineer, or contractor) explaining why vacant possession is necessary
  • Evidence of intention — planning permission (if required), quotes from contractors, funding arrangements, or board minutes (for companies)
  • Timeline — when the works will start and how long they'll take, showing that they're imminent, not hypothetical

A vague claim that "we're planning to do some work on the property" won't satisfy the court. Judges look for concrete, documented plans with a realistic timeline.

Compensation (Ground 6B Only)

If the court makes an order on Ground 6B, it may order the landlord to pay a sum sufficient to cover damage or loss the tenant sustained as a result of the possession order. The court must take into account the circumstances that made Ground 6B available, including conduct by the tenant that caused or contributed to it.

Ground 6 (voluntary redevelopment) doesn't carry a statutory compensation duty, though some landlords offer a voluntary payment to encourage the tenant to leave without court proceedings.

When Ground 6 Overlaps With Other Grounds

Landlords sometimes combine Ground 6 with Ground 1A (selling) where the plan is to redevelop and then sell. This can work if both intentions are genuine, but citing "I'm selling" and "I'm redeveloping" on the same notice invites scrutiny about which intention is real.

If the true plan is to develop the property yourself (not sell), Ground 6 is the right ground. If the plan is to sell to a developer who will do the works, Ground 1A is the right ground — the landlord is selling, and what the buyer does with the property is the buyer's concern.

The Section 8 Notice Guide covers all mandatory grounds including Ground 6, with the notice period, evidence requirements, and the statutory text you need for Section 3 of Form 3A.

Get Your Free England Section 8 Notice Checklist

Download the England Section 8 Notice Checklist — a printable guide with checklists, scripts, and action plans you can start using today.

Learn More →