Lambeth's Part A fee is non-refundable. Apply for the wrong licence and you lose it.
Lambeth Council runs three licensing schemes for private rented homes — a unified selective licensing scheme across 23 designated wards (Phase 1 from September 2024, Phase 2 from September 2025), borough-wide additional HMO licensing until 8 December 2026, and mandatory HMO licensing under national rules. Each scheme has its own occupancy test, its own two-stage fee structure and its own set of conditions. A landlord who picks the wrong scheme, uploads a missing document or confuses the household test gets the application refused — and the Part A processing fee is gone. For a selective licence, that is £717.50 you will not see again.
All the rules are free on lambeth.gov.uk. The problem is that you need to cross-reference a dozen separate web pages, a Metastreet portal that does not save drafts reliably, multiple fee schedules and separate condition documents — then assemble everything into the right sequence before you open a live application session. One misstep and the non-refundable fee is lost.
The Lambeth Licensing Pre-Flight System: prepare offline, submit once, get it right
This guide is not another summary of landlord licensing law. It is a pre-flight system — a single, dated reference that organises every scheme Lambeth runs into a step-by-step offline workflow. You check which licence your property needs, assemble every required document, verify every fee and discount, and prepare your application answers on paper — so that when you log in to the Metastreet portal, you are copying from a completed worksheet rather than working it out in a live session.
You get a 45-page guide covering all three licensing schemes, a dated compliance checklist, and five printable worksheets — scheme selection, document audit, fee calculator, application tracking log and compliance calendar — everything a self-managing landlord needs to get the right Lambeth licence first time, in one download.
What is inside
- Ward-first decision framework — start with your property address, check whether it falls in a Phase 1 ward, a Phase 2 ward, or one of the two exempt wards (Vauxhall and Waterloo & South Bank), then work through occupancy count and household composition to identify exactly which of the three schemes applies
- Selective licensing walkthrough — the two-phase rollout across 23 wards, the Part A / Part B fee stages totalling £1,025 as at April 2026, the documents you need, and what happens at each step of the Metastreet portal application
- Additional HMO licensing walkthrough — how the three-person household test works borough-wide, why a single joint tenancy does not override HMO classification, the fee structure at £550 per habitable room, the scheme's 8 December 2026 expiry date, and what to expect at renewal
- Mandatory HMO licensing — the five-or-more person threshold that applies regardless of ward, the fee at £520 per bedroom, and the national plus local room size standards you must meet
- The Section 257 trap — buildings converted into self-contained flats before the 1991 Building Regulations may qualify as Section 257 HMOs. Individual flats inside may still need separate selective licences if they fall in a designated ward — the guide explains how to check
- Pre-flight document checklist — Gas Safety CP12, five-year EICR, EPC at minimum Band E, written Fire Risk Assessment, scale floor plans in square metres, proof of ownership, identity verification — with a tick-off list so you confirm every document is current and correctly formatted before you upload
- Two-stage fee calculator with discounts — every Part A and Part B amount for each scheme, plus the £50 reduction for EPC Band C or higher and the £75 reduction for LLAS or NRLA accredited landlords, so you pay exactly what you owe
- Fit-and-proper person test — what the council checks, what disqualifies an applicant, and how to prepare a management declaration for a property managed by an agent or where the landlord lives overseas
- Licence conditions and post-grant duties — what Lambeth requires after the licence is issued, from tenant reference checks to safety certificate renewals, with the compliance checklist as a tracking tool
- Enforcement and penalties — civil penalties up to £40,000 per offence under the Renters' Rights Act, Rent Repayment Orders covering up to 24 months of rent, the rogue landlord database, and what triggers each one
Who this is for
- Self-managing landlords in Lambeth with one or two properties who want to apply for their own licence without paying an agent £300–£500
- Accidental landlords who inherited a property or kept a former home in Lambeth and have just found out a licensing scheme applies
- Landlords who received a letter from Lambeth's Private Sector Housing Enforcement team and need to understand what the council is asking for
- HMO landlords who are unsure whether their shared house needs an additional HMO licence, a mandatory HMO licence or both
- Owners of converted buildings who need to work out whether a Section 257 classification applies and whether individual flats need separate selective licences
- Overseas or non-local landlords who must appoint a compliant local manager and want to verify the application was submitted correctly
Why not free resources?
Every designation notice, fee schedule, condition document and application form is published free on lambeth.gov.uk. We link to all of them.
The problem is not access — it is assembly, sequence and local detail. The selective licensing scheme sits on one page. The additional HMO designation is on another. The fee schedule is separate from both. The licence conditions are downloadable documents disconnected from the portal. And the Metastreet portal does not save draft applications reliably — a session timeout means starting the data entry again.
A landlord working out whether an additional HMO licence applies has to cross-reference the designation notice, check the ward boundaries, count occupants, verify household composition under the Housing Act 2004, look up the specific fee tier, compare it against the selective fee, then assemble the documents in the exact format the portal expects — all before opening a live application session. One missed step and the non-refundable Part A fee is gone.
The pre-flight system puts all three schemes in a single document, in execution order, with checklists you complete offline so the portal session is a straightforward data-entry exercise rather than a research project.
Dated to the rules it describes
Landlord licensing in Lambeth changes when designations expire and are renewed. The selective scheme runs until its designation end dates, and the additional HMO licensing scheme expires on 8 December 2026. The guide carries a clear "rules as at" date, separates the current schemes from upcoming national changes, and flags the Renters' Rights Act penalty increases that took effect in May 2026. You can see at a glance which rules apply now and which are on the horizon.
Full refund, no time limit
If the guide does not help you get your Lambeth property licensed correctly, email [email protected] and we will refund you in full. No form, no deadline, no questions.
The free checklist gives you the steps. The full guide gives you the pre-flight system — a ward-first decision framework, fee calculators, document verification, a fit-and-proper person walkthrough, step-by-step portal guidance, and five printable worksheets you complete offline before you submit — everything a self-managing landlord needs to get the right Lambeth licence first time, without losing a non-refundable application fee to a preventable error.
Frequently Asked Questions
What if the rules change after I buy?
We update the guide when the rules change. Email us any time, even years later, and we'll send you the current edition free.